Vince, Callum, Pete Bolt and Tarquin Wilton-Jones.
A trip down to 24 streamway, only looked at the easily accessible section of stream passage due to time constraints. The water levels were low, and the sandy floor exposed for the entire section to the sump pool. Callum remarked later “best trip I’ve ever done”, he really enjoyed the technical aspects.
The digging team, Jake, Tav and Mike, reported a constructive session working on slope stabilisation and spoil disposal areas. All in readiness for the next digging session.