Report by Duncan (edited)
“Duncan, and Nick with Wayne Starsmore, Claire Cohen, Connor Roe
Duncan & Nick went to clear the results of induced rapid speleogenesis, first, the wire was reeled in. The bang had turned the calcite to gravel which was easy to clear. More widening will be required though a go with a chisel first. A hole in the floor a little way back down from the end was opened up with a view down a narrow rift. This might be easier to reach by tunnelling under the false floor. The tourists joined in until the handle of the little pick broke. Refreshments were taken in the ravine until it came on to rain so we drank up and went home.”