26th July

Report by Duncan:

Duncan, Nick, Tav

“Last week’s efforts had widened the approach and Duncan was able to squeeze into the new bit.  The drill and associated materials were passed though so that three holes could be drilled in the left hand wall (facing in) to remove the squeeze.  Nick and Tav hacked a lot of mud and loose stuff out of the approach – the bulge on the right hand wall further back will be the next target to enable the smooth passage of spoil.”