7th April

Report by Tav:

Jake, Nick and Tav.
With Jake digging, Nick hauling and Tav on spoil disposal, 30 more buckets of moist, loose fill were removed from the deepening rift. Jake reported water seeping from the left-hand wall which is undercutting. Still no sign of a floor. Jake also reported that a ladder was now needed as it is becoming very difficult to climb out!”